Wordsworth Properties entrusted Green Piling to design and install the foundations for their brand-new development at Cross Bank, Balby, to deliver 59No.  2, 3, or 4 bedroom properties.

Our G-sPan modular foundation system offers an efficient and economic solution for sites with poor loadbearing strata, with benefits for programme durations and in terms of carbon savings when compared to traditional foundations in the same ground.

“The build solution offered by Green Piling suited the projects specific requirements perfectly. The driven pile and pre-cast ring beam system allowed the imported material, used to cap off the made ground below, to remain in place. This method simplified and de-risked the Earthworks Strategy and Material Management Plan considerably. It also resulted a cost saving, and a significant time reduction compared to strip footings.

Green Piling delivered an excellent service from the first meeting, and we will explore the use of their G-sPan system on all our future projects.”

Jonathan Bailey, Managing Director Wordsworth Properties